Performances and projects

Operational performance
Equipment maintenance, associated logistics and spare parts tracking are essential to GMP’s performance. Dedicated teams are engaged on a daily basis to provide both operating assistance and equipment maintenance. The aim is to guarantee a maximum equipment availability 24/7.
To reach this, GMP deploys multi-skilled teams which are constantly trained and adapted to improvements of the equipments.

On-going extensions
- Extended maritime operating area as a result of the extension of the Port 2000 terminal
n 2018, GMP won the service concession for berths 11 & 12 at Port 2000 and will have access to the yard in 2023. Work on the yard will be completed in the last quarter of 2026.
These two berths will supply GMP with:
- an additional 25 ha to ensure the growth of GMP
- 350m of additional linear quay space to accommodate 3 ships simultaneously
- A larger quay surface and storage capacity: + 5M TEU/year
- investment programme for additional handling equipment: + 2 gantry cranes
- a simplified interchange area offering more road appointments
- a reserved area with a quay dedicated to inland waterways to ensure reliable modal transfer
- Other expansion opportunities
Asia-Osaka: call for expressions of interest -> reception of container ships, ferries, cruises, RO-RO, etc.
East expansion: reception area for barge handling and/or container storage